Located in Campbell River
Menzies Marine is located in Menzies Bay, British Columbia, at the Campbell River Marine Terminal, approximately 14 km north of Campbell River just off Highway 19.
Services
A division of Campbell River Marine Terminal, Menzies Marine was launched 2019 and features a 150 ton travel lift and is a full-service boatyard with working room for 10 vessels.
About Menzies Marine
Hours of Operation
Services
Menzies Marine takes care of all your vessel maintenance needs.
FOR AN ESTIMATE OR TO BOOK A LIFT CALL 250-286-3370
Our Lift
Haul-out /150 ton capacity lift and can handle vessels 9 meters or 30 ft. wide and 30.5 meters or 100 feet long. In addition to two-way hauls for vessels being blocked in the yard, we are happy to provide one-way hauls for surveys or quick below the waterline inspections and maintenance.
Rates and Fees
Rates posted below will take effect May 1st, 2023.
FOR AN ESTIMATE
Call: 250-286-3370
LENGTH | FULL LIFT | ½ LIFT | NOTES |
---|---|---|---|
Up to 36 ft. | $400 Flat Rate | $300 Flat Rate | 24' - 30' Beam add 30% and 110 - 150 tons add 20% |
37 – 39 ft | $12.24 / ft | $400 Flat Rate | 24' - 30' Beam add 30% and 110 - 150 tons add 20% |
40 – 49 | $13.50 / ft | $9.30 / ft | 24' - 30' Beam add 30% and 110 - 150 tons add 20% |
50 – 59 | $15.02/ ft | $10.00 / ft | 24' - 30' Beam add 30% and 110 - 150 tons add 20% |
60 – 69 | $16.69/ ft | $11.00 / ft | 24' - 30' Beam add 30% and 110 - 150 tons add 20% |
70 – 79 | $18.20 / ft | $12.80 / ft | 24' - 30' Beam add 30% and 110 - 150 tons add 20% |
80 – 89 | $19.25 / ft | $13.00 / ft | 24' - 30' Beam add 30% and 110 - 150 tons add 20% |
90 + | Quotation necessary |
Note* – Extra chages apply for vessels having a Width / Breadth over 24’. Call for quotation.
ITEM | COST / HOUR or FEE | NOTES |
---|---|---|
YARD TECHNICIAN | $110.00 / hour | |
WELDING / FABRICATING | $115.00 / hour | |
MECHANICAL / ELECTRICAL / FIBERGLASSING | $120.00 / hour | |
POWER WASHING | $68.00 / HOUR | • All boats must be washed • Extra disposal charges may apply for heavy growth |
ENVIRONMENTAL FEE | $37.00 / LIFT | Additional charges may apply if necessary |
CONTRACTOR FEE | $10.00 / HOUR | Coordination with Boatyard Manager is required. |
LAY DAY | $1.55 / ft. / DAY | • No charge for day of lift and launch. • No charge for days MM works on vessel. |
SKIFF ASSIST | $157.50 / HOUR | 1 Hour Minimum |
SHORE POWER 15 AMP | $16 / WEEK | |
SHORE POWER 30 AMP | $32 / WEEK |
Yard Rules / Terms & Conditions
Menzies Marine is an industrial setting and follows all WorkSafeBC requirements to ensure a safe working environment. Appropriate clothing, protective gear and safe work practices are required.
Smoking is not permitted in the Menzies Marine yard or Campbell River Marine Terminal except in the designated smoking area.
All services must be provided and performed by Menzies Marine.
Contractors are permitted to provide work that is not provided by Menzies Marine.
Owners must sign a work order prior to any work beginning on a vessel.
Parking in the yard is restricted to loading and unloading only.
Parking at Campbell River Marine Terminal is provided in designated area only.
Contractors must sign in at the Menzies Marine office.
Location
7990 North Island Hwy, Campbell River, BC, V9W 2E9
Mailing Address
P.O. Box 963
Campbell River, BC
V9W 6Y4